Projects
Projects
Improving Safety, Security, Equity and Access
To maximize instruction, our students need environments that are conducive to learning. Roofs that leak into classrooms, learning spaces that are too hot or too cold, or classrooms humming with the sound of dehumidifiers are not conducive to learning. Our students – your children – deserve better.
All schools in the Bordentown Regional School District would benefit from renovations proposed in the bond referendum that would help improve learning conditions, access and equity for students with disabilities, and safety and security districtwide.
In selecting projects to include in the bond referendum, the district focused on projects that address the most pressing needs and qualify for the maximum amount of state aid to help offset the cost to taxpayers.
Improving Learning Environments/Energy Efficiency
-
Replace out-of-warranty roofs that leaking into learning spaces and other roofs at all schools.
-
Replace heating, air conditioning and temperature control systems at all schools.
-
Replace interior lighting fixtures
-
Replace auditorium sound system in the high school
-
Replacing windows and caulking in older buildings

Outdated air conditioning unit at
Bordentown High School

Original fire alarm at MacFarland
Intermediate School
Increasing Safety and Security
-
Replace crumbling sidewalks and cracked asphalt at all schools.
-
Replace interior doors and hardware.
-
Place exterior lighting fixtures
-
Upgrade various electrical system at all school
-
Replace public address and clock systems
-
Replace fire alarm systems
-
Replace/install emergency power generators
Improving Access and Equity
-
Replace interior doors and hardware
-
Replace various plumbing components and make ADA accessible.

Outdated door at Clara Barton
Elementary School
Projects by School
-
-
Replace asphalt paving.
-
Replace/repair concrete sidewalks.
-
Replace existing roofing.
-
Replace interior doors and hardware.
-
Replace various mechanical systems throughout the building and make structural upgrades to accommodate new mechanical equipment. Replace Rooftop unit, exhaust fans chiller, unit heaters, variable aid volume boxes, automatic temperature control system and other equipment.
-
Replace plumbing components.
-
Upgrade electrical systems throughout the building. Replace auditorium sound system and interior and exterior lighting fixtures.
-
Replace/install emergency power generators.
-
Replace public address and clock systems.
-
Replace fire alarm system throughout the building.
-
-
-
Replace asphalt paving.
-
Replace/repair existing concrete sidewalks.
-
Replace existing roofing.
-
Replace exterior windows and caulking.
-
Replace interior doors and hardware.
-
Remove and replace wood casework in classrooms.
-
Renovate pair of group toilet rooms and install additional grab bars in existing barrier free toilet compartments to comply with ADA requirements.
-
Replaces various mechanical systems throughout the building and make structural upgrades to accommodate new mechanical equipment. Replace rooftop unit, exhaust fans, chiller, unit heaters, variable aid volume boxes, boiler replacements, automatic temperature control system and other equipment.
-
Replace plumbing system components.
-
Upgrade electrical systems throughout the building.
-
Upgrade power distribution systems throughout the building.
-
-
-
Replace asphalt paving.
-
Repair/replace concrete sidewalks.
-
Replacing existing roofing.
-
Remove and replace exterior windows and caulking.
-
Remove and replace interior doors and hardware.
-
Remove and replace existing wood casework in classrooms.
-
Install additional grab bars in barrier free toilet compartments. Renovate pair of group toilet rooms to comply with ADA requirements.
-
Upgrade mechanical upgrades throughout building and make structural upgrades at various locations to accommodate new mechanical equipment. Replace rooftop unit, exhaust fans, chiller, unit heaters, variable air volume boxes, boiler, unit ventilators, and other equipment. Replace automatic temperature control system.
-
Replace various plumbing system components.
-
Upgrade electrical systems throughout building including gymnasium sound system and exterior lighting.
-
Install emergency power generator.
-
Replace public address and clock systems.
-
Replace fire alarm systems throughout the building.
-
-
-
Replace asphalt paving.
-
Replace/repair existing concrete sidewalks.
-
Replace existing roofing.
-
Remove and replace existing exterior windows and caulking.
-
Remove and replace existing interior doors and hardware.
-
Remove and replace existing wood casework in classrooms.
-
Install additional grab bars in barrier free toilet compartments. Renovate pair of group toilet rooms to comply with ADA requirements.
-
Upgrade various mechanical systems throughout building and make structural upgrades at various locations to accommodate new mechanical equipment. Replace rooftop unit, exhaust fans, chiller, unit heaters, variable air volume boxes, boiler, and unit ventilators and other equipment. Replace existing automatic temperature control system.
-
Replace various plumbing system components.
-
Upgrade electrical upgrades throughout building.
-
Upgrade power distribution systems throughout the building.
-
Install emergency power generator.
-
Replace public address and clock systems.
-
Replace fire alarm systems throughout the building.
-
-
-
Replace asphalt paving.
-
Replace concrete sidewalks.
-
Replace existing roofing.
-
Remove and replace exterior windows and caulking.
-
Remove and replace interior doors and hardware.
-
Remove and replace wood casework in classrooms.
-
Install additional grab bars in toilet compartments. Renovate pair of group toilet rooms to comply with ADA requirements.
-
Upgrade various mechanical systems throughout building and make structural upgrades to accommodate new mechanical equipment. Replace rooftop unit, exhaust fans, chiller, unit heaters, variable air volume boxes, boilers, and other equipment. Replace automatic temperature control system.
-
Replace various plumbing system components.
-
Upgrade electrical system throughout building, including exterior and interior lighting fixture replacement.
-
Upgrade power distribution systems throughout the building.
-